Bulletin

Mudd Air Quality Testing Information

Facilities Operations, Procurement, and Auxiliary Services

Following the power outage at the Mudd Center, air quality testing was conducted once power was restored.  The testing was performed as a precautionary measure to ensure the safety of our staff and occupants. As is the case with all buildings when they sit idle for a period of time, this was part of standard procedure. You can view the test results by clicking HERE.

For each location, the top line represents data collected several days into the shutdown, while the bottom line reflects results taken after the building systems had been fully operational for 36 hours.