|
|
|
||||||||||||
|
|
The
Construction of the Adam J. Lewis Center for Environmental
Studies, Photographs by
Holly
Matyas |
||||||||||||
|
Ironworkers
prepare to install the second-floor metal deck. |
|
||||||||||||
|
Awaiting
installation, door frames lean against the north wall of the
auditorium. Roof joists perch free of the roof that will
eventually bear down on them. |
|
||||||||||||
|
|
|
|
|||||||||||